* Disclaimer - If ad is a click thru and you are having problems please click on link to download latest version of flash player.Flash Player

ON THE WEBSITE:

• THE TICKET: Showtimes, reviews, games & more
• DINING GUIDE:Your source for T&D Region restaurants
• DOWN ON THE FARM: News, videos and more
• PET CORNER: Your home for news and PET IDOL
Advanced Search
You are not logged in. | Login | Register

Log in to TheTandD.com

*Member ID:
*Password:
Remember login?
(requires cookies)
  Forgot Your Password?
 

SCDOT surveys U.S 78-321 intersection in preparation for improvement project

By LAURA G. CARLSON, T&D CorrespondentFriday, August 01, 2008

Leave a Comment | Default | Large

DENMARK, S.C. – Major improvements, including possible construction of a traffic circle, are planned for one of the city of Denmark’s major intersections.

S.C. Department of Transportation personnel have been doing survey work at the intersection of U.S. 78 and 321 in Denmark since April, but the actual work may not begin for another year or two, according to the SCDOT.

The narrow turning radius at the intersection has sometimes led to tractor-trailer trucks running up onto sidewalks and sometimes even into buildings over the years, underscoring the need for intersection improvements.

SCDOT Geodetic Tech II Russell Bedenbaugh is part of the survey team that’s currently working in Denmark.

“Basically, we are just locating the road, sidewalks, buildings and utilities around this U.S. 321-U.S. 78 intersection. I’m not sure what they have planned,” Bedenbaugh said. “Our information is sent on to the SCDOT offices with engineers in Columbia. Our information tells them what they have to work around as they make their project plans.”

Mac Vaugh, SCDOT crew chief for preconstruction surveys, says the work order for intersection improvement has personnel surveying from U.S. 78 and every side street that intersects with it in Denmark, from Hampton Street to Holland Street, as well as U.S. 321 and every side street that intersects it, from Byrnes and Richards streets to Highway 70 and Hagood Street.

“We have to research property boundaries for almost 200 parcels both in the courthouse and with our survey out here,” Vaugh said.

T&D Correspondent Laura G. Carlson can be reached by e-mail at Laura@carlsonclan.com or by phone at 803-793-3336.

 
Leave a Comment
The following comments are reader submitted. They do not represent the views of The T&D or Lee Enterprises.



» Post a comment Thanks for your comment! Once approved, your comment will appear on the site.

You must be logged in to comment.

Click Here To Sign in

Click here to get an account
it's free and quick
Please note: The Times and Democrat provides our story commenting feature in order to solicit feedback, debate and discussion on topics of local interest. Please keep in mind that civility is a necessary component of productive conversation. All blatantly inflammatory or otherwise inappropriate comments (i.e. vulgarity, marketing, etc.) are subject to rejection and/or removal. Comments will appear if and when they are approved. Thanks for reading, and thanks for participating.
A S.C. Department of Transportation survey crew has been working in the city of Denmark since April preparation for improvements planned at the U.S. 78-321 intersection. The crew is locating and mapping property boundaries, utility lines, buildings and roadways. The actual construction work is still a year or two off.

More News