* Disclaimer - If ad is a click thru and you are having problems please click on link to download latest version of flash player.Flash Player

ON THE WEBSITE:

• STAR CLOVERS: Treking into the 4-H future
• 2010 HOOPS CHALLENGE: Play for the glory
• VIDEO: Jogger killed by plane
• STUDY: Too many invasive tests being given
• PATH TO THE DRAFT: Diary of Ricky Sapp

Advanced Search
You are not logged in. | Login | Register

Log in to TheTandD.com

*Member ID:
*Password:
Remember login?
(requires cookies)
  Forgot Your Password?
 

Boeing may expand S.C. plant for 787 production

By BRUCE SMITH, The Associated Press  Thursday, August 27, 2009

Leave a Comment | Default | Large

CHARLESTON, S.C. (AP) — Boeing Co. is seeking permits to expand its South Carolina plant, one of several being considered for an assembly line for its new 787 wide-body jetliners, a company spokesman said Wednesday.

Boeing spokesman Russ Young said the company is notifying state and local officials about applying for permits at the North Charleston plant, but noted there will be no decision on where to locate a second line until year’s end.

The Chicago-based company has been evaluating potential sites for a second assembly line for the 787, a next-generation aircraft built for fuel efficiency with lightweight carbon composite parts and its best-selling new model to date.

But production of the 787 has been hampered by problems stemming partly from Boeing’s reliance on global suppliers to build large sections of the aircraft. Those sections are later assembled at its commercial aircraft facilities in Everett, Wash.

The production glitches and an eight-week strike by union workers last fall have led to repeated delays of the 787’s first test flight and deliveries.

The troubles with the 787 program have cost Boeing credibility and billions of dollars in anticipated expenses and penalties. First deliveries are now about two years behind schedule.

Still, the 787 remains a priority for Boeing, which has struggled with sharply lower orders as the global economic slowdown has eroded demand for air travel and cargo services.

The North Charleston plant, which Boeing bought last month from Vought for $580 million plus about $420 million in debt forgiveness, makes fuselage sections for the 787. Analysts saw the acquisition of the plant, which was built in 2005, as an effort by Boeing to exert greater control over the production process and resolve supplier problems.

Because of the lead time required to get building permits, the company may also seek them for other locations, Young said. Boeing has declined to specify other sites being considered.

Young said people should not read too much into the decision to seek the South Carolina permits.

“Understand this is a procedural step. It certainly recognizes Charleston is a candidate as is Everett, Wash., and other locations,” he said.

The company plans to have the new assembly line operating by 2012, Young said.

Young said the announcement makes it easier for Boeing officials to work on getting the permits without having to be secretive about the process as might be the case with other industrial developments.

“There’s a lot of work to be done and it’s best done with a clear understanding of what we are doing and why,” he said.

“In this case there is an existing site, but how much work is required to make it potentially make it suitable for a facility like this and how much time that will take is part of the work to be done,” he said.

U.S. Rep. Henry Brown, R-S.C., called the development good news for the Charleston area.

“The potential for increasing Boeing’s presence in our state is a massive vote of confidence in the quality of the South Carolina workforce,” he said.

Washington U.S. Sens. Maria Cantwell and Patty Murray, both Democrats, said the state has been home to Boeing since 1916.

“Our commitment to keeping Boeing in Washington has never wavered and never will,” a joint statement said, adding “the second line belongs in Washington state.”

U.S. Rep. Dave Reichert, R-Wash., said the news “makes clear the need for increased urgency and determination in our fight to keep Boeing here in Washington State.”

Shares of Boeing dipped 43 cents to close at $47.82 Wednesday.

———

AP Business Writer Daniel Lovering contributed to this report.

To subscribe to the print edition of The Times and Democrat, click here.

 
Leave a Comment
The following comments are reader submitted. They do not represent the views of The T&D or Lee Enterprises.



» Post a comment Thanks for your comment! Once approved, your comment will appear on the site.

You must be logged in to comment.

Click Here To Sign in

Click here to get an account
it's free and quick
Please note: The Times and Democrat provides our story commenting feature in order to solicit feedback, debate and discussion on topics of local interest. Please keep in mind that civility is a necessary component of productive conversation. All blatantly inflammatory or otherwise inappropriate comments (i.e. vulgarity, marketing, etc.) are subject to rejection and/or removal. Comments will appear if and when they are approved. Thanks for reading, and thanks for participating.




More Business